1. Tweefontein Mine requires the cleaning and clearing of vegetation on the existing haul road culvert, culvert A & B located in the Tweefonteinspruit. This required to remove any flow obstructions (reeds, silt, etc.), and to enable pre- and post-walk structural inspections on the culverts for the proposed future dragline relocation and installation of V - Notches.